PORTWARE. Handbook

Appendix · Chapter 32

Glossary

What the terms used in the book and the interface mean.

For: everyoneReading: 6 min

Product and layer names

TermMeaning
PORTWAREThe whole system: the open-source core + the layers written on top of it
PORTWARE OfficeThe layer that edits office documents in the browser
CoworkThe AI assistant inside the system
SOTIONThe knowledge base: nested pages, variables, select properties
SODRAWA diagram editor inside rich text
exTableAn Excel-like table inside rich text
PLMThe product life-cycle management package

Records and interface

TermMeaning
RecordA single row of data in the system: a customer, a quotation, a product
ModelA kind of record; its technical name is usually written dot.separated
Form / listThe detail of one record / the listing of records
ChatterThe notes, messages and history section below a record
NoteText that stays internal
MessageText that goes to followers as an e-mail
FollowerA person kept informed of a record's messages
ActivityA dated piece of work with an owner, attached to a record
FacetA filter piece that settles in the search box
Tab stripThe bottom strip for switching between screens open at the same time
ArchiveDropping a record from lists; not deleting it

Commercial process

TermMeaning
LeadA contact not yet qualified
OpportunityA qualified sales possibility
QuotationA price offer given to the customer
OrderA confirmed quotation
Shipment / transferA stock movement
Delivery noteThe shipping document
Bill of materials (BOM)What a product is made from
PricelistPrice rules by customer/dealer group
VAT withholding (tevkifat)Part of the VAT being declared by the buyer (Türkiye)

AI

TermMeaning
TierThe fast / balanced / strong / reasoning class
PinChoosing a specific model by hand
ToolA system function the model can call
GroundingEvery claim resting on a record or a file
Thinking budgetThe share a model may spend before answering
Bake-offMeasuring the candidates with the same questions
Usage logThe model, token and cost record of every turn

Administration

TermMeaning
Module / add-onA package that adds a capability to the system
Scheduled action (cron)A job that runs regularly in the background
Access rightPermission to read/write a whole model
Record ruleA rule that determines which records are seen

Specific to this book

TermMeaning
CaseA real example of use

Finance, budget and objectives

TermMeaning
MeasureA named figure; which accounts it is calculated from is defined once, centrally
KPIAn indicator born of measure arithmetic and watched constantly
ScorecardThe screen where indicators are gathered with value, trend, target and status
TDHPThe Turkish uniform chart of accounts
Liquid AssetsMoney in cash and at the bank; the opening balance of the cash projection
ScenarioThe base / optimistic / pessimistic version of a budget
RevisionA new version replacing an approved budget; the old one stays as evidence
VarianceThe difference between actual and plan; a positive one is always worse than plan
CommitmentSpending that is approved but not yet invoiced
Control PolicyWhat the budget does to a document: off / warn / block
Budget OverrunAn overrun recorded by control; stored together with the policy in force at the time
DriverAn assumption entered month by month: units, price, people, exchange rate
AssumptionApplying driver values to a budget line with a formula
Volume effectRevenue variance from selling a different number of units than planned: (actual units − plan units) × plan price
Price effectRevenue variance from selling the units at a different price than planned
Mix effectVariance arising when the split of sales between expensive and cheap products changes
Rolling forecastA forecast that replaces closed months with actuals and extends forward
Cost centreThe analytic account an expense is charged to
Analytic distributionThe rule for sharing a journal item across cost centres
OKRPeriodic objective management: objective + key result
ObjectiveWhat we want to achieve; qualitative
Key ResultHow we will know we reached the objective; quantitative
Check-inA figure + a sentence + confidence written on a key result
ConfidenceOn track / At risk / Off track — written, not computed
AlignmentWhich objective serves which
CycleThe period in which OKRs are written and scored

Projects and planning

TermMeaning
MethodologyThe way of working a project declares: Scrum, Kanban, Waterfall, Stage-Gate
SprintA committed working period in Scrum with a set start and end
BacklogWork not yet taken into a sprint
Story PointsThe relative size of work; not an absolute duration
VelocityThe amount of work completed in a period; a planning reference, not a performance grade
Cycle timeThe time from an item's start to its finish
Burndown ChartThe daily course of the remaining work over a sprint
WIP LimitThe upper limit on the number of items that may be in a stage at once
Work Item TypeInitiative, Epic, Story, Task, Sub-task
Stage-GateA method in which moving to the next stage depends on approval
GateThe approval of a stage transition; the requester cannot approve
ReleaseA published deliverable; its target date and release date are kept separately
ComponentA named part of the product with an owner; its difference from a tag is its owner and scope
Typed linkAn information link between tasks (relates to, duplicates, causes, clones) — not a scheduling constraint
Planned windowThe start–end range in which a task is worked on; not the deadline
Dates EstimatedThe mark that a window was derived by the system, not by a person
LoadThe ratio of committed work time to available working time
Not countedWork that cannot enter capacity because it has no window or allocated hours